Just realized it has been a while since we posted anything and that's because the stuff we are working at is small and doesn't really have much visual impact. We are still missing pieces for the kitchen, so drawers have no faces and the sink cabinet has no doors. Counter tops are still being shopped for. One of the local companies wanted as much for laminate as we would pay for beautiful concrete counters, so we are still looking.
On the accomplishment side of things, the cabinets that have doors or drawers are all hung or installed. The bathroom vanity is installed with handles and all, but no counter-top. The kick plates in the kitchen are installed. Two built in closets are completed in the master bedroom and the front entrance. Actually the front entrance is the only room nearing completion. It just needs the trim to be painted.
Interior doors are hung but need trim. Paint is complete in the front entrance, master bedroom and bath, kitchen and den and a huge test patch is on the longest wall which is 42', so it has to be a color we love. Some new lighting has been installed. So the list of things to do is smaller than before, but we have given ourselves until next week to have the major things all done as our furniture is expected the end of the week.