Stepped footings were installed due to the change in elevation between the front and the back of the house. We knew there was a change, but it certainly did not appear to be as big visually as it really was. We were disheartened to learn that we would be spending a few pennies on back-fill, as this was a slab-on-grade foundation, and something would have to go into the big hole.
The ICF (insulated concrete forms being installed by Saturn Concrete of Smiths Falls. Allan Murray and his crew did amazing work. They would just show up, do what needed be, and then leave with the breeze. Can't say enough good stuff about the work.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgFdjEORzrjtjAJPOQKtNKGwZqLmAe_bnNd06M9hErt8VmBLA3xioVbZnMflr2l0OH9z3QW3UqS1d-wWueQK73q2JunrQi68eE5o5HmEFLy27F3rxWMJKT8viIL-Wj8znOaqygWE7RklW4/s200/P6160036.JPG)
The robotic concrete pump filled the forms directly from the concrete trucks which were parked below the site.