skip to main | skip to sidebar

Kenyon Road Musings

A Straw Bale Building Diary

Tuesday, October 6, 2009

Others hard at work

The final plaster operation was the parging application. We used a piece of foam insulation to protect the flashing from the plaster and sprayed it on. It was then trowelled smooth and finally brushed later that night.


David and Andre, taking a break from proceedings.


Posted by Donna at 5:38 PM
Newer Post Older Post Home

Blog Archive

  • ▼  2009 (143)
    • ►  July (20)
    • ►  August (42)
    • ►  September (22)
    • ▼  October (33)
      • How to Convert Cat to Chicken
      • A week of great eats
      • It's been three long weeks.
      • Our Second Glitch
      • Meanwhile, back at the ranch
      • Next comes the drywall prep
      • Outside Prep for Plaster
      • We are reminded of what great friends we have
      • The Drywall Arrival
      • The Drywallers Visit
      • They're BAAACKK
      • Our cast and crew
      • Others hard at work
      • The Cathedral Ceiling
      • The Wildlife Visits
      • How hard is it to buy a toilet?
      • The Week of Rest
      • Some of our treasures
      • My most favourite thing that makes me smile everyday
      • I think we are caught up now
      • We're Floored
      • The First Glimpse of the Building Without the Tarps
      • Work Continues on the Exterior
      • Fall Is Definately in the Air
      • A ton to share but everything else pales compared ...
      • Floor Pics
      • Back at it
      • What your newspapers become
      • Another Before and After
      • The Trades Return
      • Foiled Yet Again
      • Can you spot what's missing?
      • Almost finished on the outside
    • ►  November (14)
    • ►  December (12)
  • ►  2010 (25)
    • ►  January (7)
    • ►  February (3)
    • ►  March (1)
    • ►  May (7)
    • ►  July (6)
    • ►  August (1)