Friday, August 14, 2009

The Framing Push





The last of the interior walls has been installed. In these pics, Justin and Andre are ensuring the last wall is plumb and I am installing blocking in the foyer. A couple of more crooked walls (what we lovingly refer to our cathedral walls as) have been built to finish the interior framing.